The Illinois Toll Authority
discovered that I was avoiding the traffic on I0294 and I-88, and using 355.
So they placed 355 under construction, as well.
Closing loopholes in sanity since 1955. Fucktards.
discovered that I was avoiding the traffic on I0294 and I-88, and using 355.
So they placed 355 under construction, as well.
Closing loopholes in sanity since 1955. Fucktards.
I’ve come to the conclusion that those big orange signs that say “END CONSTRUCTION” would be great models for protest bumper stickers.
(And no, I’m not a Luddite, but damn — did these people never hear of the concept of phased downtime scheduling?)
apparently not.
Federal inefficiency at its finest. Gotta hate those guys.
But it’s not Federal, Dick. It’s the states spending Federal money.
Good point, I regress.
And how come they always put the barrels out in April, tear enough stuff up to make the lanes un-openable when they move to another project in the meantime, then leave the project alone until September, and try to rush it through before the weather changes?